QA Site Checks and Testing
Check site design and functionality. Notate any discovered issues on additional sheets and attach to the checklist. Do not mark item until it passes the verification.
____ Review site design.
____ Test all site functionality. Notate any discovered design issues (use additional paper if necessary):
Verify site settings:
____ Verify Site Name and Tagline.
____ Confirm Favicon is in place.
____ Verify the “Discourage search engines…” checkbox is not ticked.
____ Verify site timezone to be in area of client.
____ Verify site data format to reflect: January 31, 2015
____ Verify site time format to reflect: 10:00 am
____ Verify site weak start to begin on Sunday
Ensure all forms on site are setup (only applies to forms built on the website)
____ Ensure correct fields are required or not
____ Ensure email notifications are set up on each form and correct recipients have been added to each form notification.
____ BCC websiteforms@ocgcreative.com to email notifications for each form
____ Ensure that the honeypot security is active
____ Ensure token based spam protection is active
____ Ensure that no-conflict mode is active
____ Ensure that auto load captcha is active and that recaptcha V3 is selected for it
Check for cross-browser compatibility.
____ Chrome
____ Safari
____ Firefox
____ Microsoft Edge
____ Other
____________________________________________________________
____ Confirm responsive breakdown and correct mobile views.
____ Confirm Mobile Menu is active and stylized.
____ Proper 404 error page setup.
____ Check for cross-browser compatibility.
____ Verify image quality & relevance.
____ Check images for stock watermarks.
____ Ensure content is formatted properly. Proofread all content. Remove any duplicat content.
Performance Check
____ Check performance of website prior to adding the performance enhancement plugins by using any one of the available online page speed test sites. Notate any poor scores and possible issues identified by the page speed test. Sites with poor scores should be sent back to development for review.
Development Signoff: ___________________________________________
Pre-Launch Timetable
____ Establish launch timetable with client. Enter it below:
____ Comfirm each department is prepared for post-live testing
____ Confirm any legal compliance if necessary
Launch Date:__________________________